Progress Continues

| Author | Comment | ||
|---|---|---|---|
Deepsouth14 |
New track under construction UPDATED |
Lead | |
|
A few photos of my second routed track under constuction. More pics as work continues.
Progress Continues
![]()
Last Edited By: Deepsouth14 03/31/08 06:46 PM.
Edited 1 time.
|
|||
SJSlots |
|||
|
Looks like she'll be very fast!! Little kink around the drain pipe might be a little tricky huh?
" If you can't beat em'.... beat ON them!"
Shawn@HomeRacingWorld.com Cincinnati, Ohio U.S.A -------------
|
|||
turbokev |
|||
|
I like that you have the provision to switch in a section to make it an oval as well.. Should be a great layout~!
~turbokev~
|
|||
Teamsterjohn |
|||
|
A great looking layout.
|
|||
lola91 |
|||
|
sjslots wrote:Little kink around the drain pipe might be a little tricky huh? not if you are out front |
|||
Asmith |
|||
|
Big fast banking you got there. Very nice design. Looking forward to seeing the blow by blow progress updates. Is that a removable section to make an oval?
Nice work! Alan
Last Edited By: Asmith
03/31/08 02:58 AM.
Edited 1 times.
|
|||
super8mm |
|||
|
Wow TWO tracks...wish I had a basement...nice fast work...I see Slot It gear assemblies in your future...you will need some long legs on those
tracks...2.73's I think...Save the 4.11s for me!!
Keep the picture posting going! Cheers, Mike |
|||